COMPILE IN THE BRIDGE GENERAL ASSEMBLY

WHAT: COMPILE at the BRIDGE General Assembly

WHERE: Brussels, Belgium

WHEN: 11th – 12th February 2020

BRIDGE General Assembly took place between February 11th and 12th at the European Commission in Brussels.

The meetings was the occasion to present 4 reports produced by BRIDGE Working Groups and Task Forces during the last period, as well as to discover the new BRIDGE projects and hear the feedbacks and lessons learned from ended projects. Several parallel sessions were organized to strengthen the collaboration between projects and discuss about future BRIDGE topics in 2020.

COMPILE was represented by Assoc Prof. Andrej Gubina who introduced the project during the Parallel Session 8 “Council of European Energy Regulators (CEER) Meets BRIDGE Projects”, discussing the link between Horizon 2020 projects and CEER regulatory issues.

BRIDGE is a European Commission initiative which unites Horizon 2020 Smart Grid and Energy Storage Projects to create a structured view of cross-cutting issues which are encountered in the demonstration projects and may constitute an obstacle to innovation.

More information and photos about the event are available on BRIDGE Twitter.